Bill of Quantities
(BOQ)

  • Source, thickness, and types of ceramic, stone (or other finishes including thresholds)

  • Confirm that all finishes are included in the BOQ

  • Clarify the contractor's scope regarding counters, drawers, mirrors, accessories, millwork, etc.

  • Specify the type of waterproofing

  • Define the excavation level

  • Include the hardware set for doors

  • Main door to be separated item in the BOQ

  • Appendix to the BOQ should be attached with pictures of the finishing schedule materials work as a mood board as a guide line for the required samples

  • Garage door should be motorized with sensor (not manual)